Davidtmp wrote:Why does everyone seem to think footers are blocks of concrete set into the ground?? Is it the age factor? Just so you know, the footers are more than concrete. They lay rebar as well for strength, and pour the concrete into the hole over that. If you notice on the KD fansite, the long wire cylinder looking things are for that as well. Same thing is used when building bridges, if you run across one on your travels.
When the footer process begins, you will see a load of rebar come in first. Go check out the Cobra page and you will see what I mean. http://carolinacobra.carowinds.com/public/gallery/index.cfm?gallery_directory=construction&startRow=31&maxRow=15
The boxes we see now are for drainage, and the pipes are attached to the boxes to lead the water where they want it to go. Whether these are for the splash down, we'll see. My hunch says yes.


























patrick2pointoh wrote:Insert rebar joke attempt here
b&mcoaster1095 wrote:I think that giant drill is drilling holes for footers, right?patrick2pointoh wrote:Insert rebar joke attempt here
carowindsman6654 wrote:The machine you see is a drill used to dig holes to put rebar into the ground to hold concrete which is used to hold footers. Every hole you see dug by the machine is where a footer is likely to go in the end.